XN-9000 Maximum Workload – from project planning to routine operation

Share:

Listens: 0

Sysmex Europe Podcast

Science


The haematology street in the Geesthacht lab of the Dr Kramer and Colleagues Medical Care Centre in Germany is one of the first installations of an XN-9000 Maximum Workload configuration in Europe. Follow the project and see how the customer's needs are addressed in terms of workflow and diagnostic performance.